All business decision tools

Should the next production hours come from overtime or another shift?

Compare loaded hourly cost, productivity, shift overhead and supervisor cost for the same output need.

Example scenario

Editable demonstration inputs, not verified industry benchmarks. Enable JavaScript to calculate your own scenario.

Standard productive hours needed / month
800
Standard loaded labor cost / hour
$35
Overtime pay premium
50 %
Second-shift relative productivity
85 %
Monthly second-shift fixed overhead
$12,000
Monthly second-shift supervisor cost
$7,000
Second-shift savings versus overtime-$9,941

Example result only, not a forecast or promise.

Monthly overtime cost
$42,000
Monthly second-shift cost
$51,941
Second-shift staffed hours required
941.2

What to do with this result

Check available overtime, hiring lead time, fatigue and quality constraints; this comparison does not override labor or safety rules.

Know what is inside the model.

Planning model, not personalized financial advice. Your inputs remain in your browser.

Calculation method

Overtime cost = required productive hours × hourly cost × (1 + premium). Second shift = required hours / productivity × standard hourly cost + overhead + supervisor.

Assumptions and limitations

  • Example inputs are editable scenarios, not Aryo results or independently verified industry benchmarks.
  • Recovered capacity is not booked revenue or automatic cash savings. Validate the bottleneck, quality and demand before monetizing output.

Turn the number into a decision.

Explore the relevant service

Explore all 200 business decision tools