All business decision tools

Does this job quote cover setup, processing and outside work?

Build a quote from batch setup hours, cycle time, material yield and target contribution margin.

Example scenario

Editable demonstration inputs, not verified industry benchmarks. Enable JavaScript to calculate your own scenario.

Good units ordered
500 units
Material cost / started unit
$20
Good-unit yield
95 %
Machine minutes / started unit
4
Batch setup hours
6
Machine + operator cost / hour
$90
Outside processing / good unit
$5
Target contribution margin
30 %
Minimum batch quote at target margin$23,892

Example result only, not a forecast or promise.

Quote / good unit
$48
Estimated batch cost
$16,724
Material starts required
527

What to do with this result

Validate routing, yield and setup assumptions with the shop; confirm what overhead is included in the hourly rate.

Know what is inside the model.

Planning model, not personalized financial advice. Your inputs remain in your browser.

Calculation method

Started units = good units / yield. Batch cost = started units × (material + cycle minutes / 60 × rate) + setup hours × rate + good units × outside processing. Quote = cost / (1 − margin).

Assumptions and limitations

  • Example inputs are editable scenarios, not Aryo results or independently verified industry benchmarks.
  • Recovered capacity is not booked revenue or automatic cash savings. Validate the bottleneck, quality and demand before monetizing output.

Turn the number into a decision.

Explore the relevant service

Explore all 200 business decision tools