Does this job quote cover setup, processing and outside work?
Build a quote from batch setup hours, cycle time, material yield and target contribution margin.
Example scenario
Editable demonstration inputs, not verified industry benchmarks. Enable JavaScript to calculate your own scenario.
- Good units ordered
- 500 units
- Material cost / started unit
- $20
- Good-unit yield
- 95 %
- Machine minutes / started unit
- 4
- Batch setup hours
- 6
- Machine + operator cost / hour
- $90
- Outside processing / good unit
- $5
- Target contribution margin
- 30 %
Minimum batch quote at target margin
Example result only, not a forecast or promise.
- Quote / good unit
- $48
- Estimated batch cost
- $16,724
- Material starts required
- 527
What to do with this result
Validate routing, yield and setup assumptions with the shop; confirm what overhead is included in the hourly rate.
Know what is inside the model.
Planning model, not personalized financial advice. Your inputs remain in your browser.
Calculation method
Started units = good units / yield. Batch cost = started units × (material + cycle minutes / 60 × rate) + setup hours × rate + good units × outside processing. Quote = cost / (1 − margin).
Assumptions and limitations
- Example inputs are editable scenarios, not Aryo results or independently verified industry benchmarks.
- Recovered capacity is not booked revenue or automatic cash savings. Validate the bottleneck, quality and demand before monetizing output.