All business tools

Reorder Point & EOQ Planner

How much to order, when to reorder, and how much safety stock you need for the service level you want.

Example scenario—not a forecast or verified benchmark. Enable JavaScript to edit inputs, view charts, save locally and export your analysis.

Example inputs

Item or SKU
Top-selling SKU
Annual demand
12,000
Daily demand variability (standard deviation)
15
Selling days per year
250
Supplier lead time
14
Cost to place one order
85
Unit cost
22
Annual holding cost (% of unit cost)
25
Target service level
95
Your current order quantity
3,000

Example results

Order 609 units at a time (about 19.7 orders/yr) and reorder at 765 units, including 93 units of safety stock at 95% service; saves $5,240 a year vs. your current order size.

Economic order quantity
609
Reorder point
765
Safety stock
93
Orders per year
19.7
Days between orders
13 days
Annual ordering + holding cost at EOQ
$3,350
Savings vs. current order quantity
$5,240
Average inventory value
$8,737

What stands out

You order 4.9x the economic quantity

Ordering 3,000 units costs $8,590 a year in ordering + holding vs. $3,350 at the EOQ of 609, a $5,240 difference.

Reorder when stock hits 765 units

That covers 672 units of expected demand during the 14-day lead time plus 93 units of safety stock ($2,037 tied up).

Going to 99% service adds 38 units of safety stock

About $210 more per year in holding cost. Reserve it for items where a stockout loses the customer.

Next actions

  1. Set a min/max in your system for Top-selling SKU: reorder point 765, order quantity 609 (round to the nearest case or pallet).
  2. Ask the supplier to cut lead time from 14 days; halving it cuts safety stock by about 29%.
  3. Recalculate quarterly or whenever demand, lead time, or unit cost moves more than 20%.
  4. Apply this to your top 20% of SKUs by spend first; they usually carry most of the inventory dollars.

Model assumptions & limitations

  • Classic EOQ assumes steady demand, a fixed order cost, and no quantity discounts; check price breaks before rounding up.
  • Safety stock = z × daily demand std. dev. × √lead time; assumes normally distributed demand and a fixed lead time.
  • z-values: 90% = 1.28, 95% = 1.65, 98% = 2.05, 99% = 2.33 (cycle service level).
  • Holding cost of 25% of unit cost per year is your input; 20-30% is a commonly quoted range.

Explore the relevant Aryo service · All 100 tools