Process Bottleneck Finder

Find the one step that caps your output, how long work waits in line, and what fixing it is worth.

Example scenario—not a forecast or verified benchmark. Enable JavaScript to edit inputs, view charts, save locally and export your analysis.

Example inputs

Process steps, in order
[{"name":"Order entry & quoting","cycleMin":15,"waitHours":4,"capacityPerDay":40},{"name":"Engineering / design","cycleMin":60,"waitHours":16,"capacityPerDay":14},{"name":"Production","cycleMin":90,"waitHours":24,"capacityPerDay":11},{"name":"QA / inspection","cycleMin":20,"waitHours":6,"capacityPerDay":25},{"name":"Ship / install","cycleMin":25,"waitHours":8,"capacityPerDay":30}]
Customer demand
13
Gross profit per unit
450
Working days per year
250
Capacity gain you could achieve at the bottleneck
25

Example results

Production is your bottleneck: fixing it by 25% adds 2 units/day, worth about $225K a year in gross profit.

Bottleneck step
Production
Annual profit from fixing it
$225,000
Current throughput
11
Unmet demand
2
Gross profit lost to the constraint
$225,000
End-to-end lead time
62 hrs
Process cycle efficiency
5.7%
Bottleneck utilization
118.2%

What stands out

Production caps output at 11 units/day

Demand is 13/day, so 2 units/day go unbuilt, roughly $225K of gross profit a year.

Work is actively touched 5.7% of the time

A unit spends 61.5 hours end to end but only 3.5 hours being worked on. The longest queue is before Production (24 hrs).

Next actions

  1. Protect Production: never let it sit idle waiting on inputs, breaks, or setups. An hour lost there is an hour lost for the whole business.
  2. Add capacity at Production first (overtime, a second shift, cross-trained staff, or offloading non-critical work) before investing anywhere else.
  3. Cut the 24-hour queue before Production with smaller batches and a daily priority list.
  4. Re-measure capacity after each change; the constraint will move.

Model assumptions & limitations

  • Capacities are steady-state averages; real throughput is lower when demand is uneven.
  • Gain assumes the extra output can be sold at the same gross profit per unit.
  • The ~85% utilization warning is a queueing rule of thumb, not a hard limit.
  • Wait times are entered by you; lead time = sum of hands-on and queue times.